11
Project Board / Re: My 750F2 project.
« Last post by Cb750r on Today at 07:13:25 AM »It’s been a bit since last post. I’ve been working away at things.
Engine is now fully assembled! Everything checked, head torqued, and re torqued, cam degree’d ready to go back in the frame. I have cleaned all the wiring connectors at the “fuse box” side of things, I’ve also cleaned up the wiring harness in general and have new left hand switch to wire in as I’m using a Mikuni stand alone throttle for the new carbs.
Will share more as engine gets back in frame.
Engine is now fully assembled! Everything checked, head torqued, and re torqued, cam degree’d ready to go back in the frame. I have cleaned all the wiring connectors at the “fuse box” side of things, I’ve also cleaned up the wiring harness in general and have new left hand switch to wire in as I’m using a Mikuni stand alone throttle for the new carbs.
Will share more as engine gets back in frame.