SOHC.co.uk Forums > CB750

It's only taken 3 years

<< < (3/12) > >>

Green1:
Wouldn't I be better of keeping it as a rolling frame so the new tube is welded in the right place?
I realized something wasn't right when it was on the centre stand and both wheels touched the floor.

Trigger:

--- Quote from: Green1 on April 04, 2015, 09:38:54 PM ---Wouldn't I be better of keeping it as a rolling frame so the new tube is welded in the right place?
I realized something wasn't right when it was on the centre stand and both wheels touched the floor.

--- End quote ---

Any place that straightens frames, needs to put it in a jig. So, they will only want the frame and possibly the arm.
Did it spring when you removed the engine ?   

JamesH:
Mick, give motoliner a call on Tuesday and talk it through with them. I'm confident they're the best place for you and like the guys have said at least you'll know the frame is 100% sorted then. I think you can book it in with them for a same day service so long as you agree in advance. Gutting I know, but given the value of the bike it's worth the investment...

Trigger:
Mick, i have had solid cross bar put in before to stop it from bending. James is right, no sort cuts or it will only bite you back  ;)

Green1:
I think the frame is perfect the engine just fell out.It hasn't been ridden since it bust.
When I lifted it onto the stand the weld on the left broke due to the tube rusting.With the weight of the bike on it it squashed the tube and rolled forward on the stand until it tore the other weld.

James I will call them and see what they say

Mick

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version