SOHC.co.uk Forums > CB750

It's only taken 3 years

<< < (10/12) > >>

steff750:
 ;) dont rush it looking good
that is my problem i cant wait to get things up and running,i will need to strip a couple of my bikes again this winter because i couldn't wait ,jobs like valve guides pistons rings timing chains clutch,but i do enjoy it good theropy for my drinking,its just that I'm getting that i prefer riding them than working on them when the weather is like today

UK Pete:
Nice one mick, did you lift it in or lay the bike over the engine
pete

Green1:
I laid the bike over with the wheels and mudguards still attached.As it was a last Min decision to do it.
It was fookin heavy  ::) 

Mick

Green1:

--- Quote from: steff750 on July 15, 2015, 09:44:13 PM --- ;) dont rush it looking good
that is my problem i cant wait to get things up and running,i will need to strip a couple of my bikes again this winter because i couldn't wait ,jobs like valve guides pistons rings timing chains clutch,but i do enjoy it good theropy for my drinking,its just that I'm getting that i prefer riding them than working on them when the weather is like today

--- End quote ---

It looks better in the photos  ::) I would rather be riding it that building it.

Mick

Green1:
I may have to slow this build down just found a washer on the floor.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version