Ash,
Just run through it methodically one point at a time. Check the three output wires to ground there should be infinity no reading on all three wires. Do this with it in place as the windings can short to ground in site but read OK when off the bike.
Run through the rest of the steps one by one. Make sure all the earth points are good.