That would be interesting to see, I called him last year but he explained that it was at least a 45 week lead time for his CR750 tank, shows the demand for terrific craftsmanship, nice chap, luckily Holtworks are about to start making them so the lucky first few to order wont have such a wait, it wont be long before they too have a long waiting list though.